Case Study – Newport Brewery

posted in: Case Studies | 0

For this project we had to lay a modified concrete resin screed to falls, so water would naturally go to the drains. We then topped with a polythene screed and finished with coving for easy cleaning and low maintenance.  

Case Study – Cafe Floor

posted in: Case Studies | 0

Cafe Floor This was a commercial property where we had get a new floor installed as quickly as possible for the owners. The floor is MMA (Methacrylate) and we were able to complete the work within one day.